This is berm 2 back filled about 1/2 way. That was 30 wheel barrows worth of dirt.


This is berm 1 after close to 40 loads of dirt. I'd say it is about 1/2 way done. I'm going to get each berm this far then go back and start back filling again. If i can get 2 berms a week done, i should be ready for flows and bumps by the end of the month. Here's to wishfull thinking!


No comments:
Post a Comment